Case Study: Edmonton Commercial Site Development
Project Overview
In an increasingly dense urban landscape, installing comprehensive utility infrastructure for commercial developments presents numerous challenges for contractors. This case study examines how Trenchcor Utilities successfully executed a complex utility installation for a major commercial development in downtown Edmonton, completing the project ahead of schedule with zero safety incidents despite numerous logistical challenges.
Project Details
Client: Westland Development Corporation
Location: Downtown Edmonton Business District
Project Timeline: August 2022 - January 2023
Project Scope:
- 1.8 kilometers of water main installation (200mm-300mm diameter)
- 2.1 kilometers of sanitary sewer infrastructure (300mm-450mm diameter)
- 1.5 kilometers of storm sewer installation (450mm-900mm diameter)
- 1.2 kilometers of natural gas distribution lines
- Electrical duct bank installation for primary and secondary services
- Telecommunications infrastructure (fiber optic and copper)
- Multiple utility vault installations
- Service connections to four commercial buildings
Challenges
The project presented several significant challenges requiring innovative approaches and meticulous planning:
1. Dense Urban Environment
The downtown location presented substantial constraints:
- Limited workspace and staging areas
- High-volume traffic on surrounding streets
- Proximity to occupied commercial buildings
- Underground congestion from existing utilities
Results and Outcomes
The project achieved exceptional results across multiple performance metrics:
1. Safety Performance
The project completed with:
- Zero lost-time incidents
- Zero recordable incidents
- Zero near-misses involving the public
- 100% compliance with safety protocols
- 16,500 total man-hours worked safely
Client Testimonial
"Trenchcor Utilities exceeded our expectations on every aspect of this challenging project. Their meticulous planning, innovative problem-solving, and unwavering commitment to safety resulted in an exceptionally smooth project execution despite the complex urban environment. The zero-incident completion is particularly impressive considering the numerous challenges involved. We look forward to partnering with Trenchcor on future developments."
Related Resources
- Urban Utility Installation Best Practices
- Commercial Site Development Planning Guide
- Safety Excellence in Downtown Construction Projects
Ready to discuss your commercial development utility needs?
Contact UsRelated Posts

HDD vs Open Cut: When to Choose Each Method
A comprehensive comparison of horizontal directional drilling and traditional open cut trenching.
Read More
The Future of Hydrovac Technology
Exploring next-generation equipment that's making daylighting safer and more efficient.
Read More
Alberta's New Pipeline Regulations: What Contractors Need to Know
Breaking down the latest regulatory changes affecting utility contractors across the province.
Read MoreTrusted By
Our Partners
We're proud to work with leading energy companies and safety organizations across Alberta.

Joint Venture Partnership:
Proudly partnering with Urban Underground for efficient community development
One trench, multiple utilities – minimizing community disruption